Reconstruction of Mahshahr wharf
Rehabilitation of Mahshahr wharf is one of the projects implemented in Sarouge Bon Pey Company, which was implemented on this wharf in 1999 by the research and development team of this company 22 years ago.
Sarothane 800 was used in this project, which has properties such as resistance to corrosion of sea salt water and the movement of waves and tides, as well as extremely high and elastic adhesion.
In 22 parts of this structure, local corrosions have occurred after 22 years, which was due to the lack of proper implementation of the original executor of this project. And when they tried to reconstruct it, they realized that they could not easily remove the sarothane substance with a sandblasting machine and consuming a large amount of sand from these surfaces, which showed the excellent resistance of these substances even over time. We draw your attention to the correspondence of the research and development team and the consulting engineers of this company to provide a solution to remove this material:
Effects of local corrosion due to poor performance in Mahshahr Petrochemical Export Wharf after twenty-four years of Sarothane coating resistance
The following is the response of the director of the research and development team of this company to the above request: